Skip to content
STEEL CABLE & WIRE ROPE INSTRUMENTS Application-led selection · Global B2B inquiries
CTMRIGGING & FORCE INSTRUMENTS
Menu

ENGINEERING RFQ / RENTAL EVALUATION

Request a cable tension meter quote.

Wire rope diameter and expected tension come first. Add the measurement style, output and destination so we can review a suitable configuration.

1 / Choose calibration & kit requests

Selected add-on budget (primary instrument only): $180 USD. Optional estimates only; the written offer defines base inclusions, profile count, case protection rating and final compatibility. No double charge for an item included in the agreed base kit.

TOTAL EXPENSE / CASH COMMITTED

Compare ownership with the actual rental terms.

Purchase price starts at an editable example of $980, not a CTM quotation. The rental defaults follow the linked Checkline CTM-RENT listing reviewed November 1, 2026; confirm current availability and terms.

A refundable deposit affects cash committed, not the final rental expense. Taxes, calibration, damage charges and downtime are additional where applicable.

Source: Checkline rental terms →
Enter your project quotations
Rental expense $1,500 · rental cash including refundable deposit $4,500 · purchase plus selected options and transport $1,160. Selected optional budget: $180.

A CTM rental service, inventory, price or guaranteed dispatch date is not implied. Ask for a written purchase offer and delivery scope.

2 / Send the cable & installation requirements
List individual ropes for calibration review (optional)0 / 15 profiles

Use one row per diameter, construction and material combination. The same diameter with a different construction needs a separate review. Include units; write “unknown” for a detail you need help identifying.

This list describes your requirements. Adding rows does not select a package or change its budget. Profile count, memory slots, contact parts, samples and calibrated ranges must be agreed in the offer.

0 of 15 profile rows used. Leave the list empty if you only have an overall requirement.
Additional instruments (optional · 0/5)

Keep different tasks on separate lines. Quantities count instruments or kits; elevator rope counts describe each kit. Every configuration needs a written review.

Additional instrument requests

Engineering selections stay in this browser tab while you compare pages. Name, email and company are excluded from that draft. Privacy policy.